Why are Indian Railways lost?

HomeWhy are Indian Railways lost?
Why are Indian Railways lost?

rule of thumb for new track construction is between $1 Million – $2 Million per mile, depending on who is constructing the track. Some rail clients need alot of track space to handle unit trains over a mile long. Below is a basic cost estimate for a mile long siding.

Q. What is the total cost of Indian Railways?

The total expenditure of Indian Railways at the end of the fiscal year 2020 was around 1.7 trillion Indian rupees. This was estimated to decrease to over 1.5 trillion rupees in the following year.

Q. How much does it cost to build railways?

rule of thumb for new track construction is between $1 Million – $2 Million per mile, depending on who is constructing the track. Some rail clients need alot of track space to handle unit trains over a mile long. Below is a basic cost estimate for a mile long siding.

A dual-mode locomotive is estimated to cost about ₹ 18 crore, while a 4500 HP diesel locomotive costs about ₹ 13 crore.

Q. Is Railways in profit or loss?

The Railways suffered a loss of Rs 38,017 crore in the passenger segment in the last fiscal due to the coronavirus crisis, but some of what it lost was compensated by the goodwill it earned by running Shramik Special trains, ferrying essentials and through innovation in freight movement which helped surpass last years’ …

Q. Is Indian Railway in profit?

The IRCTC recently released the results of the June quarter of the financial year 2021-22 and revealed that the company reported a profit of Rs 82.5 crore. In a positive sign for the Indian Railways, the IRCTC on Thursday reported a net profit of Rs 82.5 crore in the June quarter of 2021-22.

Q. How much does a railroad cost per km?

The lowest cost figures give a per km cost of around $347 million for rail tunnel (presumably with stations included) and $42.3 million for above ground rail.

Q. How much does a km of railway cost?

NEW DELHI: Construction of one kilometer of high speed railway track will cost Rs 100-140 crore and the country will need a total of Rs 80,000 crore to lay the entire high speed train corridor, Lok Sabha was informed today.

Q. What is the mileage of train?

The average fuel consumed per kilo- meter for all passenger and cargo trains is 7.97 L/ km. This value for local, trafficking, railway track laying and maneuvering trains is 7.92 L/km.

Q. What is the monthly income of railway?

The lowest salary for a Railway in India is ₹11,403 per month.

Q. Is Railway going to be Privatised?

The infrastructure of Indian Railways will never be privatised,” Goyal said. The Union minister said that private investment should be welcomed in order to improve railway services across the country.

Randomly suggested related videos:
Why Indian Railways is Always in Loss? Privatisation of Indian Railways | UPSC Mains GS3 Economy

Enrol to StudyIQ's Flagship UPSC IAS (Pre + Mains) LIVE Foundation Batch 9. Admissions closing on 10 DEC'22 | Enrol now – https://bit.ly/upscbatch9A time-te…

No Comments

Leave a Reply

Your email address will not be published. Required fields are marked *